The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

px + qy = r 2px - qy = 2r When solving this system of equations, x =
what does a receptor protein do? a. allows one or a few specific molecules to pass across the membrane b. allows a specific molecule to bind to it because of it
what health benefits does strength training and aerobic exercise have on people with type 2 diabetes?
What's one way we can check our answer to 2 ×10 = 20?
find the least common denominator (lcd) of 1/3 and 2/9 .
"To make all Laws which shall be necessary and proper for carrying into Execution the foregoing Powers, and all other Powers vested by this Constitution in the
Evaluate the expression for the given value of the variable(s). 5a + 5b; a = -6, b = -5 a. -55 b. 55 c. 5 d. -5
What is a40 for the arithmetic sequence presented in the table below? n 8 12 an 60 48 Hint: an = a1 + d(n − 1), where a1 is the first term and d is the common d
what is 39/40 simplified
What is atmospheric pressure