reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

Quick Check: Decide if the underlined pronoun in the sentences below is being used as a subject, a predicate nominative, or an appositive. "WE language speciali
_____ formation absorbs ultraviolet radiation that would be lethal if it reached the surface. Hydrogen Helium Ozone
The total weight limit for a truck is 100,000 pounds. The truck weighs 36,000 pounds when the truck is empty. What is the most that the truck's load can weigh?
5 is 25 percent of what number
What is x in 30x + 7=9
Trash accumulated on a jobsite does not necessarily indicate a ___ of work.
what causes enhanced greenhouse effect
Pls helppppppppppppppppppp
which of the following equations are equations of direct variation? choose all the apply A x - y =1, B 2-3y=0 , c xy=0 D x = -0.25y e X=1 F Y=-x+4
How is the “SSS” for similar triangles different from triangles congruence