crackish crackish
  • 01-04-2021
  • Computers and Technology
contestada

Which option in a Task element within Outlook indicates that the task is scheduled and will be completed on a later
date?
O Waiting on someone else
O In Progress
O Not started
O Deferred

Respuesta :

gsuzanna82 gsuzanna82
  • 01-04-2021
I think it’s in progress
Answer Link
denkikaminaristan denkikaminaristan
  • 28-04-2021

Answer: D: Deferred

Explanation:

took test

Answer Link

Otras preguntas

Which zone is located between the low-tide and high-tide limits?
What limits the impact of public opinion on public policy? (A) the interests of the minority (B) the interests of the majority (C) the interests of the pollster
which countries has the most landmass in Asia? Ukraine Belarus Russia Poland
In 7.69,which digit has the greatest value?
how could wind reshape a rock
which Expression is equivalent to 8x - 2y + x + x
With what is Mary McLeod Bethune associated? (5 points) A.She was lead prosecutor at the Nuremberg Trials. B.She was the first female advisor to President Roose
why were abolitionist opposed to how cotton was produced in the south
What can metamorphic rock change into and how does it cahnge??? Science
Is 12 ounces and 355 milliliters nearly equivalent