maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

What do you wrap your sandwich in? (pun, answer must be from the periodic table)
What is another name for 23 ten thousands?
Is 6/10 equal to 2/5
The United States disagrees with a government of a foreign country. So it imposes a(n) _____ on trade between the two countries. standard subsidy embargo
The length of a side of a square is 5x+2 units. Assuming the perimeter is 48 units, what is the area of the square?
What is one half divided by two thirds
How did Rutherford's experimental evidence lead to the development of a new atomic model?
Alicia's garden is 6.3 square feet in length and 12.6 square feet in width.Tomato plants require 2 square feet of space. How many Tomato plants can Alicia fit
a teacher weighed 145 lbsin 1986 and weighs 190 lbs in 2007. what was the rate of change in weight
What is the answer to 2a X 3a =