fosterjoseph5716 fosterjoseph5716
  • 02-05-2021
  • Mathematics
contestada

If six girls can finish sweeping the floor of a hall in 45mins,how long will the same work take ten girls to do

Respuesta :

cmckee660
cmckee660 cmckee660
  • 02-05-2021

Answer:

15 minutes i think

Step-by-step explanation:

45÷6=7.5

meaning 7.5 minutes per girl

so 4 girls would be 30 minutes of work

so 45-30=15

Answer Link

Otras preguntas

HELP. Really really need help. ASAP please. Please help me with this. I will give out a lot of extra points and a Brainly to whoever does it good. Thanks.
The sizes of matrices A and B are given. Find the sizes of AB and BA whenever they are defined. (If the matrix product is undefined, enter UNDEFINED.) A is of s
Salmon often jump waterfalls to reach their breeding grounds. Starting downstream, 3.02 m away from a waterfall 0.258 m in height, at what minimum speed must a
A marathon had 618 runners registered. Of these runners, about 0.8% completed the race in under 2 h 15 min. a) How many runners completed the race in this time?
What work must be done to place a satelite of mass 30kg in orbit at a height of 50km above the earth with a velocity of 800m sec?
(Please Answer Quickly) Find the distance between the point and the plane. (Round your answer to three decimal places.) (4, 2, 1) x − y + 2z = 6
simplify fully 40/56​
anyyyy girrllll online hereeeere m soo bored​
Plot A(2,3) and B(2,5). What is the midpoint of points A and B?
simplify fully 40/56​