emelymartinez emelymartinez
  • 01-03-2017
  • Mathematics
contestada

An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

What factor in american society caused this problem?
A bird is flying 10 feet above the water.A fish is swimming 4 feet below the water
Solve the inequality. 8. p +4<-24 (1 point) O p<-20 O p < 28 O p<-28 O p< 20 What one
38. Sentence 2: In order to be the best (Select) workplace etiquette should be acknowledged. A. coworkers he can be, some B. coworkers we can be, some C. cowork
How many mol of H2 are needed to completely react with 5.0mol of N2?
The cost of something is what a person vas a result of choice. demands invests receives relinquishes
WILL MARK BRAINLIST Search online or look through the magazines and junk mail in your home to find an example of fake news—or something that appears to be fake
HELP. How long is the minor axis for the ellipse shown below?
Nate wants to visit his friend Mac before going to the park. Nates house is located at (-2,4) while the park is located at (10,2). Find the location of macs hou
Because of a problem in the program, the timer in a video player did not begin counting until the video had been playing for several seconds. The player began c