If it takes 4 men 6 hours to repair a road, How long will it take 3 men to do the job if they work at the same rate ? A) 5 hours B) 6 hours C) 8 hours D) 9 hours

Respuesta :

Аноним Аноним
  • 02-06-2017
answer is C) 8 hours

hope it helps
Answer Link
shanobaigwa
shanobaigwa shanobaigwa
  • 07-08-2021

Answer:

step 1 : 4men = 6 hrs

3 men =  ?

step 2 : 4 times 6 = 24

step 3 : 24 divided by 3 = 8

ANSWER: 8 hours (c)

Answer Link

Otras preguntas

describe the three system related to the skeletal system
Which of the following accurately describes properties of valence? A. The greater the number of electrons an atom has to borrow or to lend, the
What happend on spring in 1940? 2. World war
6x-3y=20 through (4,-3)
A cylinder has a volume of 321 cubic units. If a cone has the same height and radius as the cylinder, what is the volume in cubic units? A.107 cubic units B.214
an elephant makes a call at 20 hz. what is the wavelength? show your work
What is the y-intercept of the function f(x)=4-5x?
GEOMETRY HELP) Triangle ABC is similar to triangle PQR. Which equation is correct?
If 27% of a number is 11.34, what is the number?
Tasha made 128 ounces of punch how many cups of punch did Latasha make