Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

21) PLEASE HELP WITH QUESTION. WILL MARK BRAINLIEST + POINTS.
How many bootstrap replicates are necessary?
Help! In Argentina is the word yo pronounced like in Mexico?? True or false?
NEED HELP ASAP The tables below show the values of f(x) and g(x) for different values of x: f(x) = 2(3)x x f(x) −2 0.22 −1 0.67 0 2 1 6 2 18 g(x) = 3x + 1 x g(
What painting did Michelangelo paint
in "Beethoven's Moonlight Sonata," what is the author,s main challenge in telling the story of the Beethoven composition?
Why did the Mexican army attack the Alamo
​in a data dictionary, a(n) _____ is the smallest piece of data that has meaning within an information system.
Solve the system of equations. ​−2x+15y=−24 ​2x+9y=24 ​​ x= y=
Can someone come up with 4 to 8 sentences of a story opening that has a mystery or crime themed it should include atleast one similie